Projects
Port Moresby Electrical – Delivering Integrated Electrical & Solar Solutions at Goldie Barracks
Southern Cross Pumps
Completion Date: November 2024
Port Moresby Electrical (PME) is proud to have successfully completed the integrated electrical and solar system installation for submersible pumps at Goldie Barracks. This project reflects our expertise in delivering innovative, sustainable, and high-quality electrical solutions that enhance infrastructure efficiency.
Our scope of work included:
- Design & Approvals: Developed the initial concept, obtained approvals from PNG Power Limited (PPL) and the client, and prepared detailed medium-voltage design documentation.
- Electrical Infrastructure: Installed a 300 KVA pole transformer as per PPL approval, upgraded existing electrical infrastructure, and implemented medium-voltage and low-voltage distribution networks.
- Solar & Pump Integration: Integrated a solar energy solution into the new low-voltage distribution network to provide renewable energy offsetting for four submersible pumps, ensuring efficiency and sustainability.
- Commissioning: Conducted comprehensive testing and commissioning, ensuring the system meets all regulatory standards and operates reliably and efficiently.
PME is committed to delivering advanced energy solutions that support critical infrastructure projects across Papua New Guinea. We take pride in our ability to provide sustainable, high-performance electrical systems that drive long-term value for our clients and communities.
For more information on our projects and services, visit www.pmepng.com.